
Installation of ECAL detector
18. 10. 2017

Support construction for the ECAL detector has been delivered and installed as a part of the HADES spectrometer in FAIR project, Darmstadt, Germany, at the end of August 2017.
Czech scientists from NPI of the CAS, Řež, started to install first ECAL modules into the frame during September 2017. Two sectors was finished rather soon, see left photo, last third sector was almost finished before the end of year 2017, see right photo, thanks to good organization and previous preparations.
Several visits are planned during first half of 2018 in order to have ECAL fully operational with four sectors to take data during first HADES experiment at FAIR Phase 0 in second half of 2018.
Read also
- Martin Kákona Awarded Prestigious Fulbright–Masaryk Scholarship for Research with NASA and LBNL
- The Nuclear Physics Institute of the CAS celebrated its 70th anniversary
- The NPI stand at VědaFest broadcast live on Czech Television
- Second “Day with Theoretical Nuclear Physics” attracted students from across the country
- Martin Schäfer receives Otto Wichterle Award
- NPI organized the ReMade@ARI workshop, focusing on cutting-edge materials characterization and international collaboration
- NPI Co-Organized the 5th Meeting of the EIC International Financial Committee at BNL
- Radiocarbon Dating Reveals Gaps in Elephant Protection
- We are participating in two new projects focused on cosmic rays
- Roman Garba presented his research in Austria and the United Kingdom