
Installation of ECAL detector
18. 10. 2017

Support construction for the ECAL detector has been delivered and installed as a part of the HADES spectrometer in FAIR project, Darmstadt, Germany, at the end of August 2017.
Czech scientists from NPI of the CAS, Řež, started to install first ECAL modules into the frame during September 2017. Two sectors was finished rather soon, see left photo, last third sector was almost finished before the end of year 2017, see right photo, thanks to good organization and previous preparations.
Several visits are planned during first half of 2018 in order to have ECAL fully operational with four sectors to take data during first HADES experiment at FAIR Phase 0 in second half of 2018.
Read also
- KATRIN experiment approaches the final phase of neutrino mass measurements
- Martin Kákona commented on the Artemis II mission
- Jan Vaněk played a key role in a study published in NATURE
- Testing of a new large-area diode at the HIMAC accelerator
- Special seminars at the NPI mark the 80th birthday of Prof Jan Kučera, Prof Pavel Exner and Dr Miloslav Znojil
- The NPI cooperates with the Czech Armed Forces
- Two special seminars will take place in March at the NPI to celebrate the 80th birthdays of our colleagues
- Vladimír Wagner spoke on Český rozhlas about the risks of Iran’s nuclear program
- NPI explores the potential of ultra‑sensitive quantum sensors
- The NPI reaches key milestone in AlphaStar project